Not known Details About CPSR
Motives for selecting the subcontracts include The point that a CPSR or continuing surveillance has disclosed enough weaknesses in a particular place of subcontracting to warrant Exclusive consideration from the ACO.(b) In assessing the acceptability with the contractor’s purchasing system, the contracting officer, in consultation Together with t